Agile Methodology and Sprint Planning (Rules and Best Practices) (2024)

Agile Methodology and Sprint Planning (Rules and Best Practices) (1)

The important ceremony in Agile Scrum is “Sprint Planning Meeting”, this is the only detailed team meeting in agile methodology, where team go through the backlog to pick the items to be work on for their coming sprint.

How well this meeting is conducted can also define the success and failure of the sprint although. In agile methodology, it’s no guarantee that a successful and good sprint planning meeting would deliver the best sprint results, but it’s most likely.

As the names describe “Sprint Planning” in agile methodology, is the starting point where team member warm up and stretches their muscles and mingle in head to head in a technical discussion to get sweated. But remember that team member should “leave the ego at the door”, engaged in “open communication” so that everyone knows honest feedback is encouraged.

Agile Methodology and Sprint Planning (Rules and Best Practices) (2)

Sprint planning is where a team (QA and Development) is locked in a room for almost more or less 2-4 hours or more to go through the backlog from the top of the stack till their capacity run out.

Here is a summary what’s going on during

What does the product owner do during a sprint planning meeting

  • Product owner go on each of the user story, define its scope.
  • Explain the team what to be done.
  • Team asked question to verify their understaing and concepts.
  • Once userstory is udnerstood, team start to the effort estimation, which mean estimating how long it will take to complete.
  • Some team use “planning poker” to spark the discussion, but its optional.
  • Team members can choose story points or hours to estimate the story (though story points are recommended).
  • Task breakdown is done separate out of sprint planning to better utilize the Product Owner and other team members.

Here are some of the best practices for agile sprint planning meeting in agile methodology

  • Create a recursive calendar invitation include all team members including development and QA.
  • Meeting invitation for agile sprint planning should be from the Product Owner.
  • Include agenda in the invitation, add the user stories link which should be included in the sprint
  • Always included more User stories to be included in the sprint then the team’ capacity. What it mean is go with the bigger chunk of backlog, as it might be possible that some of the user stories you might thing is ready for implementation is rejected by the team. So in that case, you will alway have extra user stories to be included in the sprint.
  • Make sure the User story you are proposing from the sprint should be really defined well, all the use cases, functional requirements and condition of satisfaction are in detailed level and, at least, grooming once with some senior team members.
  • Order a tea/Coffea with something sweet, sometimes a coffee bribe does work or, at least, it keep the developers or QA not to fell a sleep.
  • All team member product owner and scrum master need to be present
  • Understand the chick and pig rule in the scrum team.
  • Remember the sprint planning meeting is run by scrum master and he has the highest authority.
  • PO owner role in sprint planning meeting is only as a contributor, (s)he make active contributor in answering the question if the team have and explaining the user stories to the team.
  • Scrum master is the timekeeper, leader, facilitator, and coordinator of the agile sprint planning meeting

Practical checklist for sprint planning

Product Owner

  • Define sprint scope
  • Define each user story items in detail
  • Prepare notes or include them in the agenda the thing concern, the question for a particular user story so the team can come prepare and have those answers before the before.
  • Make sure backlog is in priority order
  • Describe definition of done for each user story and for sprint

Scrum Master

Practicalities are taken care of, since scrum master is the facilitator, make sure that all the merchandising are available for the meeting

  • Making sure video, audio conference is reserved and working
  • Pre-order coffee and light refreshment, “no coffee no code”
  • Enough post-it notes and markers, whiteboard etc.
  • Available capacity for the team (team members holidays, public holidays, etc)
  • Keep tracking the teams’ velocity vs the amount of work committed by the team

Development Team

  • Ask questions to clear any ambiguity or else “speak now or hold your … “
  • Do not commit more than you can not deliver
  • Remember to think of your personal availability for the coming sprint.
  • Taking part in technical discussion during estimation or planning poker

Share the sprint agenda with the team. Make sure to write an individual agenda for each of the sprint, it should be included in the email invitation which you send to the team.

Agile Methodology and Sprint Planning (Rules and Best Practices) (3)

Here is a short checklist for sprint planning agenda

Define sprint goal

it’s good to user real customer name and it will help to include the real email or chat conversation, so it really helps if team read those

Describe user stories

put the title of the user story, or if you are using any tool mentioned the user story IDs.

Decide the cut off point

Mention how many user story you want team to include in the sprint, let’s say first 10 or 15

Agile Methodology and Sprint Planning (Rules and Best Practices) (4)
What would be duration of sprint planning meeting if the sprint is of 1-4 weeks of length ?

The rule of thumb is one hour of sprint planning for every week of sprint length. So four weeks of sprint would have four hours of sprint planning. But it’s not recommended to do it one session.

If you do your backlog refinement and estimates outside sprint planning, you can minimize the final or official sprint planning meeting by 1–2 hours.

If the product owner not available for the sprint planning for whatever reason, it’s good to still conduct the meeting, scrum master or any other team member who have the best domain knowledge or anyone Product Owner as (s)he backup should explain the user stories.

Normally two hours should be maximum for sprint planning(even though some suggested that it should bt 4 hours, but after 2 hours in the meeting, whatever you do it not productive).

  • If you can not define all the user stories withing two hours, then it is most likely that your user stories are too ambiguous or unknown, then let the scrum follow its natural flow and let requirement emerge and elaborated more.
  • Sprint planning meeting should be used as a pull mechanism for the team. Which empowering your team to decide how they deliver the work is a core practice. In developing great scrum teams, even if they fail .. allowing them a “safe” space to fail and learn from it is your job as a Product Owner and Scrum Master.
  • Give a chance your team to negotiate which tasks or functions are true “must have”. Trust listen and trust their judgment also. Scrum team should engage with product owner so business values and prioritization can be discussed before the team can finally commit to the user stories.

Agile Sprint Planning Metting In A Nutshell

Make it Visible

Inspect it Daily

Adapt Rapidly

To have perfect Sprint planning divide the planning into two parts.

Sprint Commitment

First part sprint commitment, where the team decides which of the Backlog Items from the Product Backlog they ‘pull’ into the Sprint.

Task Breakdown

Second part the team breaks these Backlog Items into tasks, the so-called Task Breakdown, product owner doesn’t need to be present there, the scrum master is optional, the team can independently divide the task. Scrum master just need to glance through that all the user story is divided in enough granularity

It is good to practice the shorter sprint cycle to keep the sprint meeting short, shorter sprints are easier to plan, as the bigger the payload is difficult to analyze and plan. For example, for a two-week Sprint, a lot less needs to be discussed and fewer tasks will need to be identified. The side benefit will be you will have more chances to inspect the product (in Sprint Review) and inspect the process (in the Retrospective).

To run sprint planning meeting affectively

Another way to reduce the duration is to hold regular backlog refinement or grooming meetings. This will ensure the team has a shared understanding of the most important Product Backlog Items. If the grooming meeting is done regularly, this will reduce the burden from the sprint planning session. So in sprint planning session, team only needs to decide how many of these Product Backlog items they pull into the Sprint.

Agile Methodology and Sprint Planning (Rules and Best Practices) (5)

Longer sprint planning meeting is something which frustrates the team, this is something which SM should avoid.

  • Two hours per week is good, but if the team still think that its way too long then it should be reduced to the desired time from the team.
  • Dividing it into the pre-grooming meeting is a good idea or having multiple short meeting with the smaller group of team members, strictly inviting the people really needed in the meeting.
  • Timebox style, allocating maximum 3–5 min per User story, have a stopwatch handy to calculate time, if discussion goes out of 5 min, then stop discussing it further move on to another user story
  • Putting time budget per user story helped a lot and team give full energy to provide valuable input because of time pressure and unnecessary input/discussion left outside the meeting room
  • This also put pressure on Product owner, that (s)he enters the room with very defined user stories, and he should know the answer to all the question that developer would have asked. Which mean that (s)he put himself in the role of a user to find those question and have those answers ready.

Related Posts

Agile Methodology and Sprint Planning (Rules and Best Practices) (6)

15th Anniversary of the Agile Manifesto (Infographics)

Agile Methodology and Sprint Planning (Rules and Best Practices) (7)

In which House of Cards Character are you in your Agile Team

Agile Methodology and Sprint Planning (Rules and Best Practices) (8)

28 Best Motivational Quotes of all time

Agile Methodology and Sprint Planning (Rules and Best Practices) (9)

Great Books on Startups and Entrepreneurs 2016

As an Agile enthusiast with extensive experience in Agile methodologies, particularly in Scrum, I've been actively involved in numerous Sprint Planning Meetings, both as a Scrum Master and a participant. My expertise is backed by hands-on experience in facilitating these meetings and ensuring their effectiveness in driving successful sprints.

Now, delving into the concepts presented in the article, let's break down the key components of a Sprint Planning Meeting in Agile Scrum:

  1. Purpose of Sprint Planning:

    • The article emphasizes that the Sprint Planning Meeting is a crucial event in Agile methodology. It sets the stage for the upcoming sprint and plays a pivotal role in determining its success or failure.
  2. Team Dynamics:

    • Describes the meeting as a time for team members (both QA and Development) to engage in technical discussions, emphasizing the importance of leaving ego at the door and fostering open communication.
  3. Meeting Duration:

    • Specifies that the meeting typically lasts 2-4 hours, during which the team reviews the backlog and selects items to work on based on their capacity.
  4. Product Owner's Role:

    • Outlines the responsibilities of the Product Owner during the Sprint Planning Meeting, including defining the scope of user stories, answering team questions, and facilitating a clear understanding of the tasks.
  5. Effort Estimation:

    • Teams estimate the effort required for each user story, with some using techniques like "planning poker" for discussion. Story points or hours may be used for estimation, but story points are recommended.
  6. Best Practices:

    • Provides best practices for conducting a successful Sprint Planning Meeting, including creating a recursive calendar invitation, having a well-defined agenda, and ensuring the presence of all team members.
  7. Roles in the Meeting:

    • Defines the roles of the Product Owner, Scrum Master, and development team members, emphasizing the Scrum Master's role as the timekeeper, leader, facilitator, and coordinator of the meeting.
  8. Practical Checklists:

    • Offers practical checklists for the Product Owner, Scrum Master, and Development Team, ensuring that all aspects, from defining sprint scope to handling practicalities, are covered.
  9. Sprint Planning Agenda:

    • Provides a short checklist for the Sprint Planning Agenda, emphasizing the importance of defining sprint goals, describing user stories, and deciding the cutoff point for inclusion in the sprint.
  10. Duration of Sprint Planning:

    • Recommends a rule of thumb for the duration of the Sprint Planning Meeting based on the length of the sprint, with a maximum suggested duration of two hours.
  11. Sprint Planning in Two Parts:

    • Suggests dividing the Sprint Planning into two parts: Sprint Commitment and Task Breakdown, with the latter allowing the team to break backlog items into tasks independently.
  12. Tips for Effective Sprint Planning:

    • Provides additional tips for running an effective Sprint Planning Meeting, including making it visible, inspecting it daily, and adapting rapidly.
  13. Reducing Meeting Duration:

    • Proposes strategies to reduce the duration of Sprint Planning, such as holding regular backlog refinement meetings and timeboxing discussions.
  14. Longer Sprint Planning Meetings:

    • Highlights the potential frustration caused by longer Sprint Planning Meetings and suggests ways to address this issue, such as dividing the meeting into smaller sessions.
  15. Timeboxing and Pressure:

    • Recommends timeboxing discussions per user story to maintain focus and pressure, leading to more valuable input from team members and well-prepared Product Owners.

In summary, the article provides a comprehensive guide to Agile Sprint Planning Meetings, covering key aspects such as roles, best practices, checklists, and strategies for effective planning and time management. This information is valuable for Agile practitioners seeking to enhance their Sprint Planning processes.

Agile Methodology and Sprint Planning (Rules and Best Practices) (2024)

FAQs

Which techniques are used in Agile planning or sprint planning? ›

While the agile method is flexible and collaborative, it isn't chaotic; everything needs to begin with a plan.
  • Stick to a set sprint planning meeting duration. ...
  • Use estimates to make realistic decisions. ...
  • Define clear goals and outcomes. ...
  • Decide what it means to be 'done' ...
  • Align sprint goals with product goals.
Aug 4, 2021

What are the 3 questions we should discuss during the sprint planning? ›

According to the Scrum Guide, the sprint planning event addresses the following topics:
  • Topic One: Why is this sprint valuable? The Product Owner proposes how the product could increase its value and utility in the current sprint. ...
  • Topic Two: What can be done this sprint? ...
  • Topic Three: How will the chosen work get done?
Feb 6, 2022

What are the rules for sprints in Agile? ›

Every Sprint is Four Weeks or Less in Duration. There are no Breaks Between Sprints. Every Sprint is the Same Length. The Intention of Every Sprint is “Potentially Shippable” Software.

What is Agile and sprint planning? ›

Sprint planning is a stage in Agile methodologies in which teams decide which tasks to complete in an upcoming sprint and how that work will be achieved. A sprint planning meeting is a meeting that is dedicated to planning the next sprint.

What are the two techniques followed for sprint planning? ›

Sprint planning involves two key tasks: grooming the backlog and deciding which work to complete in the upcoming sprint. At Atlassian, we've found that backlog grooming is best done in a separate meeting with the product owner and scrum master before the actual sprint planning meeting.

What is sprint planning checklist? ›

Sprint planning checklist

Confirm estimated story points for all items on the backlog (or, at minimum, in the next sprint) Agree on the items to move to the new sprint. Determine the team's capacity for the upcoming sprint and compare it with the total story points proposed.

What are the key activities done in sprint planning? ›

During a sprint planning meeting, Scrum and agile teams accomplish three things:
  • Discuss how to implement a set of product backlog items.
  • Determine which set of product backlog items the team can commit to complete during the sprint (or iteration). ...
  • Choose and fine-tune the sprint goal to reflect the work of the sprint.

How do you conduct a successful sprint planning? ›

Best practices for running a sprint planning meeting
  1. Start with the big picture. ...
  2. Present new updates, feedback, and issue. ...
  3. Confirm team velocity and capacity. ...
  4. Go over backlog items. ...
  5. Determine task ownership. ...
  6. Confirm new issues, impacts, and dependencies. ...
  7. Reach a group consensus. ...
  8. Officially begin your sprint.

What are three sprint planning mistakes that need to avoid? ›

In this article, we will explore some of the most common mistakes made during sprint planning and how to avoid them.
  • 1 Mistake 1: Not having a clear sprint goal. ...
  • 2 Mistake 2: Not involving the whole team. ...
  • 3 Mistake 3: Not breaking down the work. ...
  • 4 Mistake 4: Not considering the capacity.
Sep 25, 2023

What are the 4 phases of sprint in Agile? ›

Technically, every sprint is made of four steps: planning, execution, review, and retrospective. This is what makes up the sprint cycle. But simply knowing these steps isn't enough. You need data to help you figure out the best way to tackle each sprint with maximum efficiency and speed.

How many Sprints are safe in Agile? ›

The teams work to create a Program Increment, to be delivered after 5 Sprints (10 weeks). The teams and stakeholders together are called the Agile Release Train. Agile Release Trains are aligned to a common business or technology mission. They plan, develop and deploy together.

How many Sprints can you have in Agile? ›

What Is the Agile Sprint Cycle? The Agile sprint cycle, or workflow, is the repetitive process that developers use to tackle a development project. A software project can take as many as ten sprint cycles.

What is sprint planning in simple terms? ›

What is sprint planning? Sprint planning is an event in scrum that kicks off the sprint. The purpose of sprint planning is to define what can be delivered in the sprint and how that work will be achieved. Sprint planning is done in collaboration with the whole scrum team.

Who should lead sprint planning? ›

A scrum master or coach typically facilitates sprint planning in order to ensure that the discussion is effective and that there is an agreement on the sprint goal and that the appropriate product backlog items are included in the sprint backlog.

Who runs the sprint planning? ›

The entire Scrum Team (Development Team, Scrum Master, and Product Owner) need to be present during Sprint Planning. The Scrum Guide is quite clear about this: "This plan is created by the collaborative work of the entire Scrum Team".

Which of the following techniques is used for Agile? ›

The correct answer is b. planning poker. Planning poker is a technique used in agile estimating and ...

Which of these are Agile techniques? ›

Now, let's take a look at each technique for estimating work in agile projects.
  • Three-point estimate. ...
  • Planning poker. ...
  • Affinity grouping. ...
  • Random distribution. ...
  • T-shirt sizes (Estimation units) ...
  • Buckets. ...
  • Large, small, uncertain. ...
  • Dot voting.

What are the tools and techniques of Agile? ›

Among the most well-known project management applications are ClickUp, Jira, Teamwork, Wrike, and Asana. Successful project management may be achieved by applying the five Agile techniques: Kanban, Scrum, Crystal Methodology, Extreme Programming, and DSDM Methodology.

References

Top Articles
Latest Posts
Article information

Author: Allyn Kozey

Last Updated:

Views: 6005

Rating: 4.2 / 5 (63 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Allyn Kozey

Birthday: 1993-12-21

Address: Suite 454 40343 Larson Union, Port Melia, TX 16164

Phone: +2456904400762

Job: Investor Administrator

Hobby: Sketching, Puzzles, Pet, Mountaineering, Skydiving, Dowsing, Sports

Introduction: My name is Allyn Kozey, I am a outstanding, colorful, adventurous, encouraging, zealous, tender, helpful person who loves writing and wants to share my knowledge and understanding with you.